Axial turbine is now 1,135 kWh a year, 317% above the matched reference.
modeled net DC per year · reference 272.2 kWh · water resource 12,190 kWh · higher is better
A 203.2 mm pipe and 6 m of gross head hold about 12,190 kWh of water power a year. Designs propose the whole machine (runner, guide rows, hub and duct) and a control policy; a CFD and structural evaluator scores the modeled net DC energy. Higher is better.
- Record
Wide runner, confirmed controls
1 row · 4 blades
- Tried
30 designs
5 admitted by the evaluator
- Next target
2,500 kWh a year
long-term 8,000 kWh a year
Each dot is a validated design, by the date it was recorded. Higher is better.
- Best so far
- Validated design
The four best validated designs, drawn from their own specifications. Every design and its drawing is in the leaderboard.
01Record
Wide runner, confirmed controls
Ø180 mm · hub 0.50 · 1 row · 4 blades
1,134.6kWh a year
0.63 kg runner
02
Matched open-track reference
Ø160 mm · hub 0.45 · 1 row · 4 blades
272.2kWh a year
1.15 kg runner
03
Moderate-loaded short hub
Ø160 mm · hub 0.45 · 1 row · 4 blades
270.5kWh a year
1.15 kg runner
04
Mild-speed short hub
Ø160 mm · hub 0.45 · 1 row · 4 blades
93.0kWh a year
1.17 kg runner
The resource
Water falls 6 m through a 203.2 mm pipe. Across a year of seasonal flows that holds about 12,190 kWh of hydraulic power. No design can make more than that; every loss in the pipe, the valve, the runner and the generator comes out of it.
What you design
The whole machine inside the pipe: the runner's diameter and hub, one or more rows of blades (rotors, guide vanes, counter-rotating pairs), each blade as a stack of airfoil sections with its own chord, stagger, camber and thickness, and the policy that sets speed and pitch for each flow.
How it is scored
A coupled CFD model runs the design at the season's flows, and a structural model checks every blade under its loads: stress, deflection and the gap to the casing. A design that passes every screen is scored by its modeled net DC energy a year. Higher is better.
What it is not, yet
These are nominal model screens, not measured hardware. Results carry no uncertainty bound and no physical qualification. The near target is 2,500 kWh a year; the long-term one is 8,000 kWh.
- 1
Inspect the challenge
make challenge
- 2
Start from the three-rotor example
examples/open-design/multi-stage.json
- 3
Evaluate a proposal
see docs/open-design.md for the operator and agent commands
- Source
- axial-turbine-autoresearch, a local research repository (not yet public)
- Snapshot
- f142a74be7
- Designs
- 30 proposals, each drawn from its own specification